Lots of progress on this building, today. Should be able to finish it next session.

Obviously, very much the same style as the last factory, but with a small handful of differences. Concrete pillars for all the accents, for example.

I established the control room yesterday, actually.

Also built out all the catwalks.

Lighting, pretty much identical to the last factory.

Final product routing up to the control room, to be depot’d and sink’d.

Roof on the control room, allowing for the sink to stick out.

Same style of facade, with a nice big illuminated front wall.

Back wall established. With an additional wall of lighting, as it was rather dark in that area.

Backside of the factory, with a maintenance entrance/exit.