• hddsx@lemmy.ca
      link
      fedilink
      English
      arrow-up
      8
      arrow-down
      4
      ·
      4 days ago

      I mean, yes. The advantage of fixed priced contracts over traditional cost plus contracts is that instead of Boeing twiddling their thumbs for three years wasting time trying to figure out why their original design is shit and having the government pay for it, space x is just out a rocket. Government gives 0 shits. I wonder if there penalties built in if it’s behind schedule